Mosalmya Project
The length of the main channel of 32 km with an estimated cost of 22 million US$
Completely completion of the excavation work.km was lined with concrete. Subdirectory
The length of the main channel of 32 km with an estimated cost of 22 million US$
Completely completion of the excavation work.km was lined with concrete. Subdirectory